Size : 12M Mb
Version: 1.0.6
Req: 2.2 and up
Latest update: 01.05.2018
improved graphics
The description of Dynamite Train
You are on a mission to stop the train. You must grab your bag of dynamite and place them on the bridges to make it explode. Then sit back and watch the show! Be sure to place the dynamite in a good place and not run out.Game developed by gametornado. see more
You are on a mission to stop the train. You must grab your bag of dynamite and place them on the bridges to make it explode. Then sit back and watch the show! Be sure to place the dynamite in a good place and not run out.
Game developed by gametornado.